Commercial

Commercial plastering in Sydney, priced off the drawings and built to the programme

Ceilings, partitions and wall linings for commercial buildings, scoped against the drawings and the specification, staged around the trades either side of us, and handed over flat and paint ready.

Commercial plastering is less about the trowel and more about sequence. The board, the beads and the compound are the same materials that go into a house. What changes is that a dozen other trades are working to the same programme, the ceiling has services above it that somebody has to reach again later, and the scope is written down before anyone prices it.

So the useful conversation is not how fast a floor can be sheeted. It is what the drawings and the specification actually call for, which elements sit in our package and which sit in someone else's, when the area is available and to what hours, and what has to be true on the last day for the next trade to start.

  • Priced off the drawings
  • Licence 244708C
  • Staged to your programme
Ceiling sheeted and coated with the openings for services cut in and the wall fixings spotted
Sheeted and fixed

Scoped before it is priced

We mark up the drawings, list the elements, and tell you plainly what is in and what is out.

One lining package

Ceilings, partitions and linings run as one trade package instead of three separate subcontracts.

Built around the programme

Access, hours and staging get settled before material is ordered, not after the first clash.

Handed over checked

Sanded, walked under site lighting, penetrations listed, and left ready for the trade behind us.

How it is bought

How a commercial plaster package is broken down

Commercial work is bought element by element. Here is how a plastering package is usually split on a tender, what each element is measured from, and the detail inside it that quietly decides the number.

Element in the packageWhat it gets measured fromThe detail that moves the number
Set plasterboard ceilingsReflected ceiling plan, finished height, drop and step details, and the count of service penetrationsWhether the ceiling fixes straight back to the structure or hangs on a suspension system
Exposed grid ceilingsTile schedule, module size, and how the perimeter is detailed against the wallsWhether tiles are supplied in the package or free issued, which is covered on grid ceilings
PartitionsWall type schedule, heights, head details and the opening scheduleWhether each wall stops at the ceiling line or carries through to the slab above it
Linings to existing structurePerimeter walls, furring channel or battens, and the finish called upHow straight the structure actually is once somebody puts a string line across it
Bulkheads and boxingElevations, sections, and what services are being concealed inside themWhether the line is dimensioned on paper or set out on site, as on bulkheads and pelmets
Rated and acoustic elementsThe specified system in full: framing, board layers, fixings and sealingWhether that system can be built with what is already standing, which is fire-rated lining territory
Patching and making goodArea, number of penetrations, and the finish level asked forWho cuts the openings during the job and who is closing them afterwards
The set and the finish levelThe level of finish named in the specificationThe lighting the surface will be judged under once the fitout is switched on
Office room with a suspended grid ceiling, set walls and desks in place

Trade order

Who we follow on site, and who follows us

Almost every argument on a commercial job is really a sequence argument. Plaster sits in the middle of the run, which means we are held up by the trades in front of us and we hold up the trades behind us.

Before framing can start, the structure has to be available, the set-out marked and agreed, and anything that lives inside a wall or above a ceiling roughed in or at least located. Mechanical, electrical, hydraulic and data all have work that is far cheaper before the board goes on than after it.

Once the frame is up we hold for services and for any inspection the wall type calls for, then sheet, bead, set and sand. Partitions and ceilings are normally staged against each other rather than run one after the other: a ceiling is quicker to sheet before the floor fills with joinery, and a partition is easier to frame before the ceiling closes above it.

Behind us come the painter, the joiner, the floor coverings and the fit-off trades, and every one of them is judging the surface we left. That is why the last day on our part of the programme is a walk under site lighting rather than a phone call.

Scope

What a commercial plastering package covers

This is the broad commercial page. It owns how a lining package is scoped, priced, staged and handed over. Where a narrower page owns the job, it is named and linked rather than explained twice.

What this covers

  • Wall and ceiling framing in steel track and stud, and furring channel to existing structure
  • Plasterboard, fibre cement and specialty board fixed to walls, ceilings and bulkheads
  • Set plasterboard ceilings, including the lining that meets and trims an exposed grid
  • Partitions built to a wall type schedule, with heads, openings and junction details as drawn
  • Bulkheads, ceiling steps, column boxing and enclosures around services
  • Rated and acoustic elements built as the specified system, with the details that system calls for
  • Beads, angles, shadowline and square set junctions, set to the finish level in the specification
  • Access panels set into new linings so valves, dampers and cabling stay reachable
  • Cutting, patching and making good as other trades come back through the area
  • Protection, progressive clean-up, and a handover walk under site lighting

What this is not

If your job is one of the pages on the right, we will say so and quote it there. The point of a written scope is that the site and the final invoice agree.

Before a quote

What we need in front of us to price it

A commercial quote is only as good as the information behind it. Anything on this list that comes with the enquiry takes guesswork, and therefore contingency, out of the number.

  • The architectural set: floor plans, reflected ceiling plans, elevations and sections
  • The wall type schedule and the ceiling legend, with any rated or acoustic call-ups marked
  • The finish specification, including the level of finish and any proprietary system named in it
  • The door and opening schedule, so heads and jambs get framed once rather than twice
  • Services drawings, or at least a marked-up plan showing what sits in walls and above ceilings
  • The programme, with the dates our part of the work opens and closes
  • Site access: hours, loading dock, goods lift dimensions, parking and any permit required
  • Whether the building is occupied, and by whom, on the floors around the work
  • What is free issued to us and what we are expected to supply
  • Who the site contact is, and how variations are to be raised and approved
  • Any inspection or hold point the specification requires before board can be closed up

Building types

What changes from one commercial building to the next

The trade is the same everywhere. What differs is the constraint that decides how the work is planned, and it is worth naming yours early because it usually shapes the programme more than the quantity does.

Offices

Tenancy floors and base build

Long ceiling runs, repeating wall types and heavy coordination above the ceiling line. Access is through a shared lobby and a goods lift on someone else's schedule, so delivery and rubbish removal often shape the day more than the sheeting does.

Industrial

Warehouses and workshops

Usually a lined office or amenities block inside a large shell. The lining is straightforward, the height and the impact exposure are not, which is why board choice and corner protection get decided before anything is framed.

Education

Classrooms and training rooms

Acoustic separation between rooms, impact-resistant board at low level, and a short window when the space is empty. Work is often staged into a holiday period, so the programme is fixed and the sequence has to be right first time.

Health

Consulting and treatment rooms

Dust control and separation from occupied areas matter as much as the finish. Rooms are small, penetrations are many, and the specification often calls up acoustic or rated construction between suites, which changes the framing.

Residential scale

Apartment buildings and common areas

Corridors, lobbies and basement linings, with service risers and access panels through most of it. Where the work is common property rather than inside a lot, it belongs on strata plastering.

Shell works

Base build and speculative fitout

Lining the core, risers, fire stairs and amenities so a floor can be leased. The scope is defined by what a future tenant is expected to do, which is the line that gets argued about later and is worth writing down now.

How a package runs

From the drawings to a clean handover

Six stages, and the first two are where a commercial job is won or lost. Board goes on quickly once everything in front of it is settled.

  1. 01

    Drawings and a site walk

    We read the set, mark up the ceiling and wall types, and then walk the space. Drawings tell you the intent; the walk tells you the height available, how material gets in, how square the structure is, and what is already in the way.

  2. 02

    Scope and a priced package

    Elements listed separately rather than one lump figure, with what is included, excluded, assumed, and still open. Separated pricing is what makes a variation an honest conversation later.

  3. 03

    Programme, access and staging

    We agree which areas open in which order, the working hours, how the floor is separated from anyone still using it, where material is stored, and which hold points belong to other trades. This is written down, not remembered.

  4. 04

    Frame, hold, and close up

    Track and stud set out from the marked lines, openings framed, then the frame stays open for services and any inspection the wall type requires. Nothing gets sheeted over a rough-in that has not been signed off.

  5. 05

    Sheet, bead and set

    Board fixed to the pattern the system calls for, external corners beaded, junctions formed as drawn, then joints taped and built up in coats with real drying time between them. Compound shrinks as it dries, which is why coats cannot be stacked into one day.

  6. 06

    Sand, walk and hand over

    Sanded, then checked under the site lighting rather than a work light on the floor, because that is what the surface will be seen under. Penetrations and access panels are listed, the area cleaned, and the next trade can start.

Scoping On site

Pricing

The things that change a commercial number

Two jobs with identical quantities can be very different to build. On commercial work, quantity is usually the smallest part of the price.

Hours the work can be done in

Normal hours inside an empty shell is the cheapest case. Nights, weekends and short windows between trading hours all change the rate and the number of mobilisations.

Getting material to the work face

Level, goods lift size, dock bookings and how far board is carried once it leaves the lift. Sheets that will not fit a lift get cut down or hoisted, which is a cost before any work happens.

Whether the building is occupied

An occupied floor needs dust separation, protection of finished surfaces, controlled noise periods and a tidy site at the end of every shift.

How many times we have to come back

A programme that lets us frame, sheet and set in one continuous run is efficient. One that brings us back four times around other trades costs more for the same quantity.

The finish level specified

A lining behind joinery and a lining under a wall washer light are not the same job. A higher finish level means more coats, more sanding and more checking.

Rated and acoustic call-ups

A rated or acoustic wall type is a tested system, not a board choice. Extra layers, specific fixings, insulation and sealed junctions all sit inside the price.

Site requirements

Inductions, site safety documentation, permits for after-hours access, waste handling and scaffold or platform hire all belong in the number rather than in a surprise invoice.

Narrower pages

The commercial pages that go narrower

Four kinds of commercial job have enough of their own detail to sit on their own page. If one of these is what you are actually buying, start there instead.

Office fitout plastering

The combined lining package for a fitout floor: ceilings, partitions and bulkheads staged together, base build scope separated from tenant scope, worked to a fitout programme.

Office fitouts

Commercial make-good

Tenancy handback at the end of a lease: partitions out, ceilings reinstated, walls brought back to a base building finish and presented for inspection.

Make-good

Strata plastering

Work on common property in an apartment building, where the approval, the access and the reporting matter as much as the plaster itself.

Strata work

For builders and PMs

Commercial plastering questions builders ask

If yours is not here, ask it. We would rather answer it on the phone than have you guess.

How do you price a commercial job when the drawings are not finished yet?

We price what is drawn and name what is not. Documented elements get firm numbers, and anything still moving is carried as a rate, a provisional quantity or a stated exclusion, so you can compare quotes instead of guessing which one buried the bigger allowance.

A single lump figure built on assumptions nobody wrote down is how variations turn into arguments. If we have assumed something, the assumption is on the quote in plain words so you can correct it before the job starts.

Can the work be done outside business hours or on a weekend?

Often it has to be, particularly in an occupied building or anywhere with trading hours. Tell us the available window at enquiry stage and it is built into the programme and the price, including the extra mobilisations a short shift involves.

Worth checking on your side first: what the building permits in terms of after-hours access, noise and use of the lift, and whether anyone else is booked into the same window. A shift that arrives to find no lift access is an expensive way to learn that.

Do you supply the board and the systems, or do we free issue them?

Either, as long as it is decided before the quote rather than during the job. Supplied by us, the package covers board, framing, beads, compound, fixings and any insulation the wall type needs, and the responsibility for having the right products on site is ours.

Free issue works where a builder has a supply agreement, but the scope has to say who orders, who takes delivery, who stores it and who replaces damaged sheets. Free issued material that arrives late lands on the programme, so the lead time matters as much as the price.

What do you need from us before we can start on site?

A clear work area, the set-out confirmed, services roughed in or located, power and light, and agreed access for material and waste. On a rated or acoustic element we also need the specified system confirmed in writing, because it changes the framing, not just the board.

The most useful thing is a named site contact who can make a decision. Most delays on a lining package are not plaster problems. They are a question about a head detail or a ceiling height that sat unanswered for two days.

Who is responsible for the openings other trades cut in our linings?

The trade that cuts an opening is responsible for cutting it properly: back to the framing where possible, and to the size actually needed. Closing those openings afterwards can sit with us, and it should be scoped as its own item rather than absorbed into the lining price.

Planning openings is far cheaper than repairing them. Where a valve, damper or junction box has to be reachable later, an access panel set in while the lining is being built costs a fraction of cutting and patching the same spot twice.

What level of finish should we specify?

Match it to what the surface carries and how it is lit. A lining that disappears behind joinery does not need the same finish as a lobby wall under a grazing light, and specifying the higher standard everywhere spends money where nobody will see it.

What matters is that the level is named in the specification and read the same way by the builder, the plasterer and the painter. Most disputes about a finish are two people comparing one wall against two expectations, one of which was never written down. Where a whole surface has to read flat, that is skim coating.

How do you deal with a ceiling that has to be opened again later?

By deciding at drawing stage how it gets opened. If plant above a set plasterboard ceiling needs regular access, either the ceiling gets panels where they are genuinely useful, or that area is better as a grid ceiling where any tile lifts out.

Left undecided, someone eventually cuts a hole in a finished ceiling and the patch shows under a downlight from then on. Walk the reflected ceiling plan with the mechanical and electrical contractors once, before anything is set, and mark where access has to be.

Do you paint as well, or just leave it set?

We hand over set, sanded and paint ready. Painting is a separate trade and we do not quote it, which keeps the responsibility clean: the surface we leave is measured against the specified finish level, and the coating on top is the painter's.

What helps is talking to the painter before we finish rather than after, particularly if they need the surface prepared differently for a particular coating.

Send it through

Send us the drawing set and the dates

Plans, the wall and ceiling schedules, and the window you need the work inside. We will come back with the elements priced separately, the exclusions stated, and the questions we still need answered.