Wet areas

Wet area linings for bathrooms and laundries, flat and ready for the waterproofer

Moisture-resistant and water-resistant board in the places each belongs, fixed to a flat plane, with the backing, junctions and set-out the waterproofer and the tiler can work to.

A wet area lining is a substrate. Nothing in it keeps water out of the wall: that is the waterproofing membrane, and it is licensed work by someone else. What the lining does is give the membrane and the tiles a sound, flat, correctly specified surface to sit on, which is why a poor lining shows up later as a tiling problem.

This page covers which board belongs where, why flatness matters far more in a tiled room than in a painted one, how the floor, hob, niche and ceiling junctions are handled, and where the lining sits in the sequence between the plumber, the waterproofer and the tiler.

  • A substrate, not a membrane
  • Board specified area by area
  • Flat enough for large tiles
Bathroom ceiling set with the openings for services cut in above a lined wall
Sheeted and fixed

The lining is not the membrane

Board keeps the wall sound and flat. Keeping water out of it is a licensed waterproofer's work.

The right board per area

Inside the shower, the rest of the room and the ceiling are not all the same sheet.

Flat wins or loses the tiling

A tiled wall shows every hollow and hump, and large tiles are the least forgiving of all.

Backing in before it closes

Vanity, mixer, rail, screen and towel rail all need something solid behind the board.

The rooms

Where wet area lining work happens

Six versions of the same task. The board changes, the sequencing changes, and in all of them somebody else has to work on top of what we leave.

Most common

A bathroom stripped to frame

Old lining out, frame exposed, plumbing and electrical roughed in, then relined. The best version of this job, because the framing can be straightened, the backing goes exactly where the fittings need it, and nothing is guessed at through a hole.

Common

A laundry or a powder room

Smaller, usually with a tub, a washing machine and less tiling. Often only part of the room is tiled, which means two finishes in one space: board left ready for tile in one area, fully set for paint in another, with a sensible line between them.

Kitchens

Behind a splashback

Kitchens are not showers and the substrate still matters, because a tiled or glass splashback needs a flat, properly fixed surface. Worth checking and relining while the cabinetry is out.

Overhead

The bathroom ceiling

The same room, a different set of decisions: what board the ceiling gets, how the exhaust fan penetration is handled, and whether it is set for paint or left ready for tile. Steam is a constant load up there even where no water hits it.

Apartments

A unit bathroom on a slab

Masonry or concrete in places, framing in others, and often no roof space to work from. Furring, packing or a new frame gets a true plane off an out of square wall, and building access and hours shape the program more than the work does.

Renovation

Relining an existing room

Where the old lining is coming off, what is behind it decides the job: frame condition, previous water damage and whether the studs are still true. Where plaster failed after a leak rather than as part of a planned renovation, that is water-damaged plaster first.

Board selection

Which sheet belongs where, and who decides

A bathroom is not one environment. Inside the shower, the rest of the room, the ceiling and the area behind a vanity all see different amounts of water, and the boards made for them are not interchangeable.

  1. Inside the shower and behind the bath. The wettest zone, and where the specification is least negotiable. Depending on what is specified that is a water-resistant wet area board or a fibre cement sheet, fixed at the centres its manufacturer sets out. Tile weight and membrane type influence the choice, so it is confirmed with the waterproofer and the tiler rather than decided alone.
  2. The rest of the bathroom or laundry. Outside the direct splash zones a moisture-resistant plasterboard is the usual choice: made to handle the humidity of the room rather than standing water. It takes tile or paint, it is easier to set neatly than fibre cement, and it is not a substitute for the wet zone board.
  3. The ceiling. Steam is the load and moisture-resistant board is the common answer. Where a ceiling is tiled, or sits over a shower with no exhaust, the specification may call for something heavier. The fan penetration is set out before the sheet goes up rather than cut afterwards.
  4. Who makes the call. On a specified job the architect, builder or designer names the board and we build to it. Without documents, the useful conversation is between us, the waterproofer and the tiler, because each has a requirement and the board has to satisfy all three. What we will not do is quietly downgrade a sheet because it is cheaper to handle.
Wet area ceiling sheeted and coated around a duct, with the wall lining continuing below

The lining is not the waterproofing

Wet area waterproofing in NSW is licensed work with its own requirements, applied over the lining once the lining is complete. We are not waterproofers and we do not quote it, apply it or certify it. Anyone offering to line and waterproof a bathroom as one item is worth questioning.

What the lining does is set the waterproofer up: the right board, fixed off properly, flat, with the junctions and penetrations where they belong and nothing drumming. Many membrane failures blamed on the waterproofer start as a substrate that moved, a sheet not fixed off, or a penetration cut in after the membrane went on.

Scope

What a wet area lining job takes in

This page is the substrate: framing preparation, the board, how it is fixed and how flat it is left, plus the backing and the junctions the trades after us rely on. Everything on the right is somebody else's licence, trade or page.

In the lining scope

  • Checking and correcting the frame: straightening, packing and adding studs or noggings where the plane needs it
  • Furring or framing off masonry and concrete walls to get a true surface in older rooms and units
  • Board of the specified grade for each zone, fixed at the centres the system or the manufacturer requires
  • Sheet layout planned so joints fall on framing and away from awkward corners and penetrations
  • The gap at the floor left as the specification requires, so the sheet is not standing in water
  • Backing and noggings for the vanity, the mixer, the shower rail, the screen, the towel rails and the cistern
  • Openings set out for taps, wastes, shower fittings, the exhaust fan and any recessed niche framing
  • Internal and external corners, beads and the ceiling junction prepared for what follows
  • Joints and fixings set where the area is being painted, and left as the tiler and the waterproofer need them where it is being tiled
  • A flatness check across the tiled planes before the room is handed over

Not in this scope

  • Waterproofing of any kind, which is licensed work by a waterproofer and is applied after us
  • Tiling, screeding, falls to the waste and the floor build-up, which are the tiler's scope
  • Plumbing, electrical, the exhaust fan and the fittings themselves
  • Repairing plaster that failed after a leak, which is water-damaged ceilings and wall repairs
  • Building the wall itself where a new one is needed, which is partition walls
  • Decorative finishes in a bathroom, which are a surface application: microcement and venetian plaster
  • Managing a whole bathroom renovation and its trades, which sits with your builder or with renovation plastering
  • Removing or disturbing any older sheeting that may contain asbestos, which is assessed and handled by a licensed party

The lining has to be finished, fixed off and dry before the membrane goes on, and nothing gets fixed through the membrane afterwards. That is the most important sequencing rule in the room, and it is why the backing conversation happens before we sheet.

The detail

The junctions that decide whether the room holds up

A wet area is a set of edges. The flat middle of a sheet is rarely the problem, and almost every wet area failure traces back to one of these.

The junctionWhy it mattersHow it is handled
Sheet to floorA sheet taken hard down to the slab or the floor sheet can wick up water that gets past the tilingThe board held up off the floor by the gap the specification calls for, so the membrane can be dressed into that junction properly
Internal cornersCorners move, and a rigid filled corner under a membrane is a crack waiting to happenCorners left clean, square and firmly fixed both sides, prepared as the waterproofer needs rather than filled solid
Hobs, steps and shower basesThis is where the tiler and the waterproofer have the least room to fix anything we leave out of positionFraming and board set to the finished base or hob position, confirmed against the actual base before sheeting
Recessed niches and shelvesA niche is five small planes and every one of them has to be membraned and tiledFramed with the finished tile thickness and the fall allowed for, lined in the board the wet zone calls for
Taps, wastes and fittingsEvery penetration is a hole through the membrane and the most likely place for water to get behind itOpenings cut to the fitting rather than oversized, set out with the plumber, and all of them formed before the membrane goes on
Wall to ceilingSteam collects at the top of the room and the junction often separates two different finishesThe junction detailed to suit what is happening on each side, with the tile finish line agreed before the ceiling is set

How it runs

Strip, straighten, back it up, sheet, hand over

A wet area lining is a short job inside a long program. Our part is usually one or two visits, and where they land in the sequence matters more than how fast they go.

  1. 01

    Strip and look at the frame

    Old lining out, then the frame checked for straightness, damage and anything left by a previous leak. A wall out of plane is fixed here with packing, furring or a new stud, because tile adhesive will not fix it later.

  2. 02

    Confirm what goes on the walls

    Vanity, mixer height, shower rail, screen, grab rail, towel rails, cistern, mirror cabinet. Each wants solid backing at a real height, so we would rather work off the actual fittings than a general instruction to add noggings.

  3. 03

    Sheet each zone in its board

    Layout set so joints land on framing and clear of penetrations, the specified board in each zone, fixed at the required centres, with the floor gap left as specified and openings cut to the fittings.

  4. 04

    Fix off and check the plane

    Every fixing driven properly, nothing loose, all edges supported. Then the tiled planes are checked flat, because that is the standard the tiler works to and it is far cheaper to correct now.

  5. 05

    Set what is painted, leave what is tiled

    Areas being painted are set and sanded as usual. Areas being tiled are left as the tiler and waterproofer want them, which is not the same finish and is worth agreeing in advance rather than assuming.

  6. 06

    Hand over to the waterproofer

    The room is handed over complete, dry and clean, with the penetrations known. After the membrane goes on, nothing gets drilled or patched without the waterproofer involved again.

Prepare Line and hand over

The quote

What a wet area lining is priced on

Bathrooms are small rooms with a lot of edges, so the area is only part of the story.

The board specified

Wet zone boards and fibre cement cost more than standard sheet, weigh more and take longer to cut and fix. The mix of boards in the room is the first thing that moves the price.

How much of it is tiled

A fully tiled room is a different scope from a half tiled one, because the tiled areas and the painted areas get finished differently and the line between them has to be planned.

The state of the frame

A straight frame is quick. Packing out an old wall, furring off masonry or replacing damaged studs adds time before a sheet goes on.

Niches, hobs and shaped work

Small features, disproportionate time. A recessed niche or a stepped hob takes framing, careful board work and coordination with the tile thickness.

How many penetrations

Every tap, waste, rail and fitting is an opening to set out and cut accurately. A room with a double vanity and a two outlet shower has a lot of them.

Backing requirements

Cheap while the wall is open and expensive afterwards, and the cost is in knowing where, which is why the fittings list is worth having early.

Access and the building

A ground floor bathroom in an empty house is straightforward. A third floor unit with a lift booking and nowhere to store sheets is not.

Where it sits in the program

A lining done in one clean run is efficient. Coming back three times because the plumbing was not finished is not, and that shows up in the price.

Related work

What usually sits either side of this job

Wet area lining is one item in a bigger renovation. These are the pages next to it.

Microcement

A seamfree finish sometimes used in bathrooms instead of tiles, which is a finish application over a prepared substrate.

Microcement

Questions

Wet area lining questions we get asked

Mostly about who does what, and in which order.

Do you do the waterproofing as well?

No. Wet area waterproofing is licensed work with its own requirements and it is applied over our lining by a waterproofer. We line the room, hand it over properly prepared, and stay out of the membrane entirely.

It is worth being direct about this because the two jobs get bundled together in conversation all the time. If someone quotes you to sheet and waterproof a bathroom as one line item, ask who holds the waterproofing licence and what documentation you will get for it.

Which board goes in the shower?

A board made for wet areas, and exactly which one depends on what has been specified, the membrane being used and what the tiling is. In practice that is a water-resistant wet area board or a fibre cement sheet, fixed at the centres its manufacturer requires.

Standard plasterboard does not belong there, and neither does moisture-resistant board on its own if the specification calls for something heavier. Where there is no specification, we will ask the waterproofer and the tiler what they want to work over before we order, because they are the ones who have to build on it.

Do the joints get taped and set if the room is being tiled?

Not in the same way. In an area being tiled, the joints and fixings are prepared for the membrane and the tile adhesive rather than finished as a paint-ready plaster surface, and how that is done follows the waterproofer's requirements and the board maker's instructions.

In the parts of the room being painted, the ceiling above the tile line, and any wall outside the tiled area, the joints are set and sanded in coats the same as any other room. So one bathroom often gets two different finishes, which is why the tile line is agreed before we start setting anything.

Can you line over the existing bathroom walls instead of stripping them?

Sometimes, and it is usually a false economy in a wet area. Lining over what is there means you do not know the condition of the frame or the cavity, you cannot put backing exactly where the new fittings need it, and you have added thickness that every door, window reveal and floor junction has to absorb.

In a room that is being retiled and refitted anyway, stripping back is generally the better call, because the most expensive thing in a bathroom is opening it up a second time. Where the existing lining might contain older sheeting, it has to be assessed by a licensed party before anything is disturbed.

How flat does the wall need to be for large format tiles?

Flatter than a painted wall, and flatter than most people expect. Large tiles cannot follow a curve or bridge a hollow, so any deviation in the substrate shows as lipping between tiles, and the tiler has limited ability to correct it in the adhesive bed.

That is why the framing gets straightened before sheeting rather than after, why packing and furring is normal work here, and why we check the plane across the tiled walls before handing over. If very large tiles or stone panels are going on, say so at the quote, because it raises the standard the substrate has to meet.

When do you need to be on site during a bathroom renovation?

Twice, usually. Once after the demolition and the rough-in, when the frame is open and the plumbing and electrical are in place, which is when the lining goes on. Then sometimes a short return visit for the setting of any painted areas once other work is finished.

What matters is that the lining happens after the rough-in and before the waterproofer, with nothing outstanding in between. A room that gets lined while the plumber still has work to do ends up with the wall opened again, and by then the sequence has cost more than the sheet.